Russian|English

 
 
Contact us  
   
     
 
 
 
 
 

LLC «logistic center «Podolsk»

Total area 17178 sq.m.


Property location

Location: Podolsk town, Geleznodorognaya str. 2
(Entrance on terminal’s territory from the Mashinostroiteley str.)

    • Within 15 km from MKAD on Simferopolskoe highway
    • Within 1.5 km from Simferopolskoe highway
    • Approx 20 min by car from «Dmitry Donskoy» metro station (to «Podolsk» station)
    • Approx 30 min by public transport (bus ¹ 406, 407) from «Yuzhnaya» metro station (to «Podolsk» station)
    • From «Podolsk» station to center:
        - by bus ¹ 2, 12, 9, 3
        - by trolley-bus ¹ 3
    • Domodedovo airport – approx 30 min

Location Map link



Building area description

    • Site total area - 2.63 ha
    • Building total area – 17178, of it:
            Storage facilities class A total area – 11554 sq.m
            Retail zone total area – 1710 sq.m
            Office premises total area – 2272 sq.m
            Accommodation space total area – 1642 sq.m

    • Total building area – 0.46 sq.m



Constructional solution characteristics

    • Superflat concrete floor with an antidust covering, with loading no less than 5 tons/ sq.m and 1,00 m from the ground level.
    • The most floor to ceiling height – 12.8 m
    • Column grid 12 x 24 m
    • Working altitude (up to truss edge) – 10.8 m, 6-tier storage.



Storage technology

    • Compound storage system, including:
          - 1st floor – areas of acceptance, general storage and forwarding
          - 2nd floor – retail picking (live storage racking, production line, etc.)
    • Pallet quantity – 19620
    • Retail box quantity – 14550



Dock area equipment

    Entirely equipped dock areas
          - Quantity of loading – unloading docks with automatic gates and loading – unloading warehouse areas - 19
          - Thermal screen on the gates
          - Dock levelers
          - Dock shelters



Parking

    • Car parking for employees of the warehouse – 29 m/lots.
    • Truck parking – 9m/lots.



Communications, technical conditions and security system of the property

    • Connection – high-speed fiber-optic line E1
    • Sprinkler system
    • Smoke removal
    • Fire alarm detectors
    • Employee fire-warning system
    • Energy supply – transformer substation – 860 kilowatt
    • Storage temperature from 16 to 20 C, automatic control
    • Air heating system
    • Ventilation:
          - mechanical inflow
          - natural air-funnel

    • Heat supply and hot water come from existent gas boiler
    • Cold water – comes from existent network
    • Natural discharge and sanitary sewer – into existent networks
    • Automatic dispatching control of all parameters
    • Rail spur
    • Perimeter security



Completion date

    • logistic center «Podolsk» is scheduled for delivery – Q4 2007. Building terms can be accelerated upon tenant’s request
    • Project revision in accordance with tenant’s/s’ requirements and normative documents


 

 
 


2006 LLC «Remarka»
123317, Moscow, Testovskaya St., 10, 19th floor
Tel./Fax: +7 (495) 662 1800
E-mail: